 HomeQuality Control
Quality Control

Potential Failure Mode and Sequel Analysis
According to the standard TS16949-2009, our technicians had been organized to analyze carefully and scientifically the potential failure mode and the possible results upon all the process steps among the whole production. Therefore, any factors in the production which may affect the product quality and cause invalidation can be treated in advance.

Quality Control Standards for Double Wall Steel tubes Electrical Welded

Item #

Characteristic

method

requirements

Specification

Quantity tested

1

Strip certificate:

2

chemistry of steel

supplier

SAE 1006/1008 grade

SAE J527/CAL103

per heat #

3

mechanical properties

supplier

30T scale: 35-45

CAL-103

per master coil

4

Copper thickness

supplier

2.5 - 3 microns

CAL-103

per master coil

5

Tubing certificate

6

Tube OD histogram

micrometer

Cpk = 1.33 minimum of tolerance range +/-0.07 mm

SAE J527

per mill#pallet

7

Wall thickness

micrometer

+/-0.07 mm

SAE J527

per mill#pallet

8

Coil Appearance

visual

no scratches, stains

SAE J527

per mill#pallet

9

Bevel height

transverse section

0.05 mm max

CAL-009

per mill#pallet

10

Overlap length

transverse section

> 0.64 mm

CAL-009

per mill#pallet

11

Braze joint integrity

transverse section

no porosity at the bevel

CAL-009

per mill#pallet

12

Tensile Strength

tensile test

290 Mpa

SAE J527

per mill#/Master Coil

13

Elongation in 2 inch gage length

tensile test

4.75 mm (3/16") O.D.: 17% minimum

CAL-009

per mill#/Master Coil

6.35 mm O.D.(1/4") : 21% minimum

CAL-009

per mill#/Master Coil

7.9 mm (5/16") O.D.: 25% minimum

CAL-009

per mill#/Master Coil

14

Flaring test

press

35% minimum expansion with no flaws or cracks

CAL-009

per mill#/Master Coil

15

Flattening test

Vice

no flaws or cracks at the seam

SAE J527/J1677

per mill#/Master Coil

16

Burst test

Burst tester

4.75 mm (3/16") O.D.: 110 MPa minimum

CAL-009

per mill#/Master Coil

6.35 mm O.D.(1/4") : 82.8 MPa minimum

CAL-009

per mill#/Master Coil

7.9 mm (5/16") O.D.: 75.9 MPa minimum

CAL-009

per mill#/Master Coil

17

Cleanliness test

Solvent, Analytical balance

0.2 gram/m 2 maximum; with no dark carbon deposit

CAL-009

per mill#pallet

18

Non-Destructive Test

Eddy Current Tester

No Braze Inconsistencies. No Holes. No Cracks

SAEJ527/ SAEJ1737

100%


Inspection on raw material in factory

To control strictly on the tolerances of thickness, width in different parts of the same steel strip.

Strict control on the Elongation, tensile strength and yield strength.

Carefully control the copper coating thickness between the 2.5-3 micrometers.

 

By hardness test on the surface of the steel strip, the hardness value can be confined between the 35-45 HR30T.

 

Through analysis on the metallographic organization of steel strip, the crystal granule degree can be strictly controlled.


Operation Process Control

The welding of the steel strip joint is carefully finished as per operation guide to ensure the joint solid and the same thickness between the original strip and the overlap part .

The bevel edge rolling is strictly made according to the operation guide so that the bevel thickness and strip width can meet the technical terms .

7 points control is executed as per operation guide .

The welding temperatures are set as per operation guide .

Adjust the cool water flux in term of the operation guide so that the tube can be cooled to the requested temperature .

Properly adjust the drawing force and the drawing wheel pressure according to the operation guide so that there are no slip and deform of the tubes during the process .

The detecting precision is set according to the operation guide to ensure there are no wrong points or missing points during the process .

Passivation treatment is made on the tube surface to avoid its oxidation .

To Wind the tubes as rolls in order as per operation guide .


Product Final Inspeciton

Visual check on the finished tube surface, it should appear gold color, smooth without scratch, water mark, electric nicks and fingerprints .

Ensue the diameter of the finished tube within the stipulated tolerance by measuring .

No cracks should be found during the end expanding test executed according to the operation guide .

The specimen should not be broken during the flat test stated by the operation guide .

The elongation, tensile strength and yield strength tests are made as per operation guide and all the resulted values should be in the stated range .

The polished specimens of the tube section are observed under the metallographic microscope to check the overlap length, welding-line height and width .

The inner clearness check is executed as per operation guide. The result impurity should be lower than 0.2 gram/ .

 